东莞市企石镇政务服务中心-政务服务中心二期弱电工程绩效目标表
中国东莞政府门户网站
2019-12-12 09:57:44
来源:
本网 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
企石镇财政项目支出基础信息情况表 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(适用绩效目标及部门一般性项目预算申报) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
填报单位:东莞市企石镇政务服务中心 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
项目名称 |
政务服务中心二期弱电工程 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
主管部门 |
东莞市企石镇政务服务中心 |
预算代码 |
TYLXM017002 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
项目负责人及联系电话 |
姚斯觉13602372230 |
评价小组联系人及联系电话 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
项目类别 |
(一)功能性分类
1.基本建设类□ 其中:新建□ 改扩建□
2.运转性支出类 ■
3.事业发展性支出类□ 其中:专项资金□ 普惠性支出□ 一次性补助□ 其他□
4.上级补助支出类 □
(二)是否新设立项目分类
1.新设立项目 ■
2.延续性项目 □
3.变更项目 □ |
项目性质 |
1.政府已研究确定项目 ■
2.部门经常性业务项目 □
3.跨年度支出项目 □
4.其他支出项目 □ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
项目启动时间 |
计划:2018年7月 |
项目计划完工(验收)时间 |
计划:2019年6月 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
项目设立依据(文件) |
企党政联议复[2018]2号《关于综合服务中心大楼三层至六层完善装修和硬件设施的批复》 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
项目申请理由
(背景及原因) |
我镇综合服务中心二期主体工程即将完工,根据《东莞市人民政府办公室关于印发<东莞市推进群众和企业到政府办事“最多跑一次”改革实施方案>的通知》(东府办〔2017〕108号)的要求及东莞市社保局《关于进驻基层公共服务平台有关问题的意见》的指导意见,现进一步推进大楼三层至六层的内部布局、设计装修和完善硬件设施等事宜 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
项目受益对象 |
工作人员以及群众 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
项目主要实施内容及项目组织实施条件 |
综合服务中心大楼三层至六层的弱电采购,项目计划在2018年第三季度开始进行采购等程序,进一步完善中心基础设施。 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
事业发展规划 |
项目中期事业发展规划及资金需求测算(2019年至2019年) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
年度 |
需要完成主要工作事项 |
项目支出明细及金额 |
资金需求测算依据及说明 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(2019)年度 |
完善弱电工程 |
120 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
( )年度 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
( )年度 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
… |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
金额小计 |
* |
120 |
* |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
资金预算及资金来源 |
中期资金预算(或工程项目总投资) |
中期资金预算(或工程项目总投资)总额120万元;1、其中:镇财政资金120万元,其他资金0万元。2、其中:每年运营维护费用预算0万元。 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
年度资金预算 |
本年度申请资金总额120万元;其中:镇财政资金120万元,其他资金0万元。 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
资金支出范围 |
中心大楼3层至6层的弱电采购 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
年度政府采购预算及工作计划 |
按规定是否需要政府采购 |
采购预算金额 |
采购招标时间 |
采购项目计划开工时间 |
采购项目计划完工验收时间 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
是■ 否□ |
120 |
2018年8月 |
2018年7月 |
2019年
6月 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
有关采购计划情况说明 |
|
|
|
|
|
|
以前年度绩效评价情况(延续项目填写) |
年度
(前二年) |
绩效评价等次 |
存在问题及整改落实情况 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
( )年 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
( )年 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
申报单位需要说明的其他情况 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
填报人:刘靖仪 |
|
|
|
|
|
|
|
|
|
联系电话:88077089 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
注:凡是新增项目或政策有调整的延续性项目,请提供项目立项文件、行业规范、调整内容及调整依据等佐证材料。 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
企石镇财政项目支出绩效目标申报表 |
|
|
|
|
( 2019 年度) |
|
|
|
|
填报单位(盖章):
东莞市企石镇政务服务中心 |
|
|
填报日期:2019年4月29日 |
|
|
|
|
项目
名称 |
政务服务中心二期弱电工程 |
中期资金预算(或工程项目总投资)镇财政资金(万元) |
120 |
本年度
申请镇财政预算(万元) |
120 |
|
|
|
|
总体目标 |
中期滚动目标 |
年度目标 |
|
|
|
|
产出目标: |
产出目标:能够按计划完成该项目工程,采购程序合法合规,验收顺利通过 |
|
|
|
|
效果目标: |
效果目标:工程顺利完成,弱电设备使用效果达到预期目标,使用人员感到满意 |
|
|
|
|
绩效指标 |
一级
指标 |
二级
指标 |
三级
指标 |
指标内容 |
指标值(或计划水平) |
验证材料 |
二级
指标 |
三级
指标 |
指标内容 |
本年度(2019年)计划指标值(或计划水平) |
2018年度实际(或预估)完成指标值 |
2017年实际完成指标值 |
验证材料 |
|
|
|
|
预期产出指标 |
数量指标(或建筑规模指标) |
|
|
|
|
数量指标(或工程量指标) |
设备维修次数 |
弱电实际维修次数 |
11 |
|
|
|
|
|
|
|
质量指标 |
|
|
|
|
质量指标 |
设备验收通过率 |
弱电工程验收通过率 |
100% |
|
|
|
|
|
|
|
|
|
|
|
购置合同执行率 |
弱电工程合同执行违规率 |
0% |
|
|
|
|
|
|
|
|
|
|
|
设备维修完成率 |
弱电维修完成率 |
100% |
|
|
|
|
|
|
|
|
|
|
|
采购程序规范性 |
弱电工程开展程序的实际规范性程度 |
合法合规 |
|
|
|
|
|
|
|
时效指标(工期指标) |
|
|
|
|
时效指标(工期指标、形象进度指标) |
项目执行效率 |
弱电工程项目执行效率 |
100% |
|
|
|
|
|
|
|
|
|
|
|
政府采购及时率 |
弱电工程的时效情况 |
100% |
|
|
|
|
|
|
|
预算(或投资规模)控制指标 |
|
|
|
|
预算(或投资规模)控制指标 |
预算执行率 |
弱电工程预算资金与实际所需资金的情况 |
100% |
|
|
|
|
|
|
|
预期效益指标 |
社会、经济、生态效益
指标 |
|
|
|
|
社会、经济、生态效益
指标 |
设备预设功能达标率 |
弱电工程实际预设功能达标率 |
100% |
|
|
|
|
|
|
|
|
|
|
|
设备使用率 |
弱电工程使用情况 |
100% |
|
|
|
|
|
|
|
|
|
|
|
设备到位率 |
弱电到位的实际情况 |
100% |
|
|
|
|
|
|
|
|
|
|
|
办公任务支撑程度 |
弱电工程对办公任务强度支撑情况 |
100% |
|
|
|
|
|
|
|
可持续影响指标 |
|
|
|
|
可持续影响指标 |
设备所在区域可持续性 |
设备促进所在区域经济、环境的程度 |
优 |
|
|
|
|
|
|
|
满意度指标 |
服务对象满意度指标 |
|
|
|
|
服务对象满意度指标 |
设备使用满意率 |
人员使用弱电的满意程度 |
98% |
|
|
|
|
|
|
|
申报单位需要说明的其他情况 |
|
|
|
|
|
镇财政局批复意见 |
|
|
|
|
|
填报人:刘靖仪 |
|
|
|
|
|
联系电话:88077089 |
|
|
|
|
|
|
|
|
|
注:1、此表适用于基本建设类、运作性支出类、事业发展性支出类、上级补助支出类等支出;